DOCUMENTATION



DELIVERABLES

Deliverable 2.1
Designs and specifications of an OWC able to integrate the negative spring

Deliverable 2.2
Report with designs and specifications of a Symphony able to integrate the control cocoon, electro-mechanic PTO, structural membrane and dielectric generators.

Deliverable 2.3
Engineering challenges related to full-scale and large deployment implementation of the proposed breakthroughs

Deliverable 3.2
Engineering of OWC critical parts related to submergence for large scale deployment

Deliverable 3.3
Feasibility and performance impact of Symphony structural membrane as a negative spring for OWC for large scale deployment

Deliverable 3.5
Engineering of Symphony critical parts related to continuous submergence for large scale deployment

Deliverable 3.7
Engineering of structural membrane for large scale deployment for Symphony

Deliverable 4.3
Global analysis of the selected turbine for the OWC

Deliverable 4.4
Global analysis of the selected PTO for the Symphony

Deliverable 5.1
Definition of materials and manufacturing procedure for the submerged polymeric PTO

Deliverable 5.2
Sensing electronics and control system for the submerged polymeric PTO

Deliverable 5.3
Test bench campaigns

Deliverable 6.1
Analysis of different potential configurations of non-rigid inter-moored devices

Deliverable 6.2
Analysis of different potential configurations of rigidly inter-moored devices

Deliverable 6.4
Validated numerical simulation of hydrodynamic interaction between devices for different compact array layouts

Deliverable 6.5
Design guidance on the use of shared moorings in compact arrays

Deliverable 7.1
Logistic requirements associated with the proposed breakthroughs for large scale deployment

Deliverable 7.2
Supply chain (RML) study of the innovative components for large scale deployment

Deliverable 7.3
Techno-economic assessment of the proposed breakthroughs for large scale deployment

Deliverable 7.4
EIA of the proposed breakthroughs for large scale deployment

Deliverable 7.5
LCA and socio-economic implications of large scale deployment of the proposed breakthroughs

Deliverable 8.1
Dissemination plan

Deliverable 8.2
Dissemination materials for exploitation and outreach events

Deliverable 8.3
WETFEET website & file exchange service between partners

Deliverable 8.4
Two physical demonstration models

 

POSTERS

At ICOE 2016

Project Poster

Breakthroughs in WEC arrays – Shared moorings and cablings in the WETFEET project